
Dosing
Dosing systems — gravimetric and volumetric dosing and big bag stations, built to order in the EU
Dosing systems introduce exact quantities of powders and granulate into the process, either by weighing on load cells or volumetrically, with an extraction screw. They are used by mixing, packing and processing lines in the chemical, food and pharmaceutical industries. We design and build them in our own plants in Tomești (Iași, Romania) and Bălți (Moldova).
- mixers and process systems
- 2
Specifications
Everything is built to order: the values follow from your material, your throughput and your building.
| Dosing principle | Gravimetric (weighed) · volumetric (screw metered) |
|---|---|
| Throughput range | Sized to order — request a quotation |
| Weighing accuracy | Sized to order — request a quotation |
| Hopper volume | Sized to order — request a quotation |
| Materials dosed | Powders · granulate |
| Product contact materials | AISI 304 stainless · AISI 316L stainless |
| Control system integration | Sized to order — request a quotation |
| Options | Interchangeable screws · hopper vibrator · hopper agitator · weighing report per batch |
The figures above are the ranges we build routinely, not construction limits. We design and manufacture any capacity, power rating and envelope to order — including below or above the ranges in the table.
When a dosing system is the right choice
The situations where dosing is the correct answer — and the one where we recommend a different machine of ours.
The recipe demands exact quantities, and a deviation means a rejected lot or wasted raw material.
You need traceability: the system issues a weighing report for every batch, with the recipe used.
The density of the raw material varies from lot to lot — with gravimetric dosing that does not matter, because mass is weighed rather than volume.
You receive raw material in big bags and you want the powder to enter the process in a closed circuit, with no dust in the hall.
When this is NOT the right machine
If you only need to move material from one point to another, without a guaranteed quantity, the weighing and the control system are costs you will not use.
See screw conveyors
